Pull the toilet up and out of the way.
Capping off toilet waste pipe.
Plumbers will stock caps you will need to measure across pipe axample 100m 4 inch main pipe cap.
Cap the pipes.
Unscrew sink lift away.
Slice off a bit of the top of the pipe embedded in the floor.
Many of today s drainpipes are pvc.
The mark will tell you when the fitting is pushed on all the way which is essential for a proper seal.
Water pipe 1pm caps.
Remove the gasket and its remnants.
If the floor flange for the toilet is set in concrete the job will be a lot more difficult than if it s on the second floor for example and the flooring can be removed to permanently close off the pipe.
Turn off the feed valve drain the water from the tank unhook the feed line and remove the anchoring bolts with a wrench.
Push the pipe cap onto the pipe until its edge reaches the depth mark.
If the top of the plug still sticks out above the floor you can get an internal pvc pipe cutter which is like a rotary dremel circular saw blade on a drill shaft.
To permanently close off the pipe in a concrete slab the floor flange should be removed and the pipe capped below the floor surface.
You could also probably chip it out with a knife sharp chisel.
Sink 50mm 2 inch cap.
Capping them requires the use of a pvc cleaner and a pvc glue to hold the new cap securely.
This will involve removing a portion of the surrounding concrete removing the floor flange which may have to be cut out and then the capping the pipe.
Sink disconnect pipes place end caps to water pipes disconnect out let pipe cut of to desired place cap of pipe.